Product Description
Item |
Bakelite plastic knob |
Conveyor components & accessories |
leveling feet, conveyor chain & belt, clamps, knobs, sprockets, conveyor roller, wear strip, guide rail, etc. |
Conveyor Machine |
roller conveyor, spiral conveyor, aluminium conveyor, flexible conveyor, chain belt conveyor, turning conveyor, etc. |
Flexible Conveyor System |
wheel bend, plain / vertical bend, aluminium profile, drive unit, idler end unit, support beam, guide rail clams, etc. |
Material |
Bakelite ball knob with brass female thread |
Payment |
T/T, paypal, western union, trade assurance, etc. we can discuss it. |
Sample |
Free |
Detailed Images
Custom Rubber parts
Custom plastic parts
Packaging & Delivery
Packaging Details
plastic bag packing inside, carton packing outside, or customized packing.
Port
Xingang port, Tianjin city
Lead Time
:
Quantity(Pieces) |
1 - 1000 |
1001 - 10000 |
10001 - 50000 |
>50000 |
Est. Time(days) |
5 |
12 |
18 |
To be negotiated |
Our Company
FAQ
Q1: Are you a manufacturer or a trading company?
A1: We are the original manufacturer of custom rubber parts and custom plastic parts.
Q2: Where is your company located?
A2: Our company is located in Shenzhou City, Hebei Province, China.
Q3: Could I get free samples?
A3: We could provide small samples for free, but air freight or sea freight should be borne by customer side.
Q4: What should I provide in order to get an offer?
A4: Customers are required to provide material, inner diameter, outer diameter, cross section distance and quantity.
Q5: How is the goods packed by your factory?
A5: The goods are normally packed by plastic bags, carton boxes with pallets or wooden boxes.
Q6: What are the incoterms applied?
A6: The incoterms applied are FOB, CIF and CFR.
Q7: What are the payment terms accepted?
A7: We accept Alibaba Trade Assurance, T/T, L/C and West Union.
Q8: What about the delivery time?
A8: The goods are normally dellivered to customer side within 7-30 days based upon the mode of transport required.